2.5 tonnes · 4 movers2.5-tonne boat in a heritage building
A boat with its motor inside, handled by four JB movers using a forklift, gantry and floor protection in a Gold Coast heritage building.
Read the Gold Coast boat case study
Safes, machinery, stone and difficult access. Explore 36 real projects from Sydney and the Gold Coast, showing the loads and methods behind JB’s specialist work.
Search by item or filter the work. Open the Gold Coast boat case study here or follow the original Sydney project records.
2.5 tonnes · 4 moversA boat with its motor inside, handled by four JB movers using a forklift, gantry and floor protection in a Gold Coast heritage building.
Read the Gold Coast boat case study
1.8 tonnesFour specialists, one full day and custom supports to angle a 1.8-tonne boat through a restricted warehouse exit.
Read the Sydney case study
1.5 tonnesA 1.5-tonne coffee kiosk relocated with supported loading, transport restraints and careful placement.
Read the Sydney case study
1 tonne + 400 kgA one-tonne safe and a 400 kg safe moved from Dee Why to a Palm Beach garage, with specialist safe-moving equipment and a steep driveway to manage.
Read the Sydney case study
1 tonne eachThree brewing vessels, each weighing one tonne, relocated from Mona Vale to Brookvale. JB prepared the access route, protected the venue and coordinated pallet handling with a HIAB-equipped truck.
Read the Sydney case study
400 kgA 400 kg display fridge moved down three flights of stairs, then raised over a bench into a restricted commercial service area. Stair handling and final placement needed separate equipment stages.
Read the Sydney case study
700 kgJB handled a 700 kg glass arcade machine through difficult stair access using protective materials, mechanical load control and a three-person specialist crew.
Read the Sydney case study
250 kgWhen a 250 kg commercial refrigerator would not fit through the doorway, JB planned a window entry in Glebe with traffic control, custom MDF casing and protection around a marble counter.
Read the Sydney case study
250 kgA pre-job inspection shaped the stair delivery of a 250 kg marble coffee table in Bondi. Two specialists used property protection and a stair climber to complete the access route.
Read the Sydney case study
600 kg600 kg total, delivered in two sections: a 200 kg base and a 400 kg top. JB coordinated low-vibration transport and supported alignment with a tail-lift truck, trolley and counterweighted crane.
Read the Sydney case study
250 kgJB removed the shipping crate and rebuilt the protection around a 250 kg ice bath before a controlled ascent of a long external staircase in Vaucluse.
Read the Sydney case study
700 kgA replacement lift was smaller than the building’s original lift. JB secured and mechanically tilted a 700 kg marble sculpture to negotiate the restricted opening, with lift technicians attending.
Read the Sydney case study
500 kgA 500 kg commercial machine travelled down a restricted stepped route in Marrickville using a custom ramp, rollers, haul-back restraint and controlled lifting support.
Read the Sydney case study
Specialist handlingJB handled a freestanding bath relocation with protective wrapping, specialist handling fixtures and a padded staircase, with the bath pictured inside the property.
Read the Sydney case study
Specialist handlingA tall garden figure wrapped in padded blankets, secured with straps and supported on a powered moving platform. The project photographs show courtyard handling and an inclined ramp transfer at the JB removalist truck.
Read the Sydney case study
Specialist handlingJB handled lift-shaft machinery on a tracked stair climber, using securing straps and coordinated handling within a confined staircase.
Read the Sydney case study
Specialist handlingJB relocated bronze sculptures from Versace to a Vaucluse house. Protective blankets, foam padding, wrapping and specialist moving equipment formed part of handling the detailed figures and ornate pedestals.
Read the Sydney case study
Specialist handlingA complete commercial gym moved from Bondi over narrow external stairs to storage. JB handled heavy dumbbells, kettlebells, weight plates, cardio equipment and flooring, including truck loading, transport and storage unloading.
Read the Sydney case study
250 kgJB relocated a heavy bath over stairs with a three-person crew and specialist stair-climbing equipment. The bath was padded and secured for the handling stages.
Read the Sydney case study
500 kg unitTwo removalists used two stair-climber types to move a 500 kg heating power unit and a separate water-heating vessel over stairs and through restricted doorway access at a Beverly Hills house.
Read the Sydney case study
1,000+ palletsA week-long 3M factory relocation involving more than 1,000 pallets, lathes over one tonne, a large crew and multiple trucks, with item-by-item equipment assessment, SWMS and site inductions.
Read the Sydney case study
500 kg tablesThree-person delivery of a 500 kg metal council table-tennis table, with crane-truck handling and related examples of JB moving 500–700 kg planted pots across Sydney.
Read the Sydney case study
4 t base + 1 t topA Sydney CBD commercial heavy lifting project: four-tonne and one-tonne marble sections, diamond-wire separation, specialist drilling, gantry handling and crating for Brisbane.
Read the Sydney case study
500 kgThree movers delivered an 800 kg total crated load to a Bondi hair salon, uncrated and positioned the 500 kg marble table, then removed and disposed of the timber crate.
Read the Sydney case study
300–500 kgFour JB removalists relocated 300–500 kg commercial printers over stairs using two stair-climber types. Loading the printers onto the equipment was a particularly delicate stage.
Read the Sydney case study
450 kgJB relocated a 450 kg curved marble bench through a restricted stair route, with protective wrapping, a ramp and specialist stone-handling equipment.
Read the Sydney case study
8-person spaSix JB removalists moved an eight-person spa down two flights with a turn, over a wall and through a bush path to its final position, using planned ramp arrangements.
Read the Sydney case study
1.1 tonnesA new roller door prevented an upright exit for a 1,100 kg oven. Four JB crew custom-framed and tilted it, then returned it upright through tight access at the new Sydney Fish Market.
Read the Sydney case study
Specialist handlingA two-day warehouse machinery relocation with six removalists, using trucks, forklifts, gantries, lifting slings and pallet jacks. The scope included a lathe, bandsaws, cabinets and specialist bench equipment.
Read the Sydney case study
2 tonnes eachMarble statues valued at over $250,000 each relocated from Fendi Casa Sydney. JB lifted a forklift over the fence to complete the internal movement and final positioning.
Read the Sydney case study
1 tonne · 7.5 mAn eight-person crew used four scissor lifts, pallet jacks and a HIAB crane truck to position a 7.5-metre, one-tonne table on two stands, then level it over an uneven floor.
Read the Sydney case study
1 tonneA three-person JB crew installed a one-tonne optical table at the University of Sydney using a HIAB truck and specialist indoor lifting equipment, adjusted its pneumatic supports and removed the crate in a half-day job.
Read the Sydney case study
Specialist handlingTwo JB removalists moved a 250 kg pizza oven over very narrow stairs using a stair climber, then positioned it on the concrete slab of an outdoor kitchen.
Read the Sydney case study
Specialist handlingA Sydney collection featuring carved guardian lions, a slender white statue and a tall decorative urn. See the distinctive stonework and close-up preparation around the urn’s pedestal.
Read the Sydney case study
Specialist handlingA three-person crew relocated a 1.5-tonne carved stone piece through stepped residential access. Gantry lifting, hydraulic jacks and supported movement protected the stonework and its decorative base.
Read the Sydney case study
Specialist handlingA wrapped and secured 250 kg fridge moved upstairs with JB’s stair climber. The entrance ramp, appliance protection and complete stair route formed part of the handling arrangement.
Read the Sydney case studyTry a different item or category, or tell us about your move.
BRISBANE PROJECT PLANNING
Brisbane jobs can connect a CBD loading dock, an apartment landing, a residential driveway or an industrial workshop. For Fortitude Valley, South Brisbane and Newstead, share the actual building route and booked access. For Eagle Farm and Rocklea equipment moves, identify machine preparation, loading arrangements and the receiving contact.